Run The Production Planning Process
***Note down and submit all documents no generated at the end of the each Task
Business Example
Precision Pumps Inc uses the Make-to-Stock production strategy. Using this strategy, the pumps are manufactured, stored, and then sold. For this reason, you must know how to execute the main steps required for the production planning process in SAP ECC.
Run the production planning process.
Task 1
Create a Material Master #### . For plant 1000. Use Tcode MM01
Entry Screen | |
Industry Sector | Mechanical Engineering |
Material Type | Finished Product |
Basic Data 1 | |
Material Description | Pump |
Base unit of Measure | EA |
MRP1 | |
MRP Type | PD |
MRP Controller | 000 |
Lot Size | EX |
MRP2 | |
In house production | 1 |
Scheduling Margin Key | 001 |
MRP3 | |
Strategy Group | |
Accounting 1 | |
Valuation Class | 7920-Finished product |
Price control | S |
Work Scheduling | |
Task 2
Enter planned independent requirements. In plant 1000, enter a demand program (planned independent requirements) for material ####.Select make-to-stock production (LSF requirements) for the 3 months of your planning period.
1. In the material master for pump #### enter strategy group as 10 for plant 1000 in the MRP 3 view and save the changes.
2.Display the stock/requirements list for material #### in plant 1000 Tcode (MD04)
3.In Demand Management,Tcode (MD61) enter the planned independent requirements (requirement type LSF) for material #### in plant 1000 (version 00). Set the planning period to Month format by entering the indicator M in the Planning period field on the initial screen for the transaction.
Enter the following planned independent requirements for pump ##### in plant 1000:
Planning Period | Value |
Current month | 25 |
Current month+1 | 25 |
Current month+2 | 25 |
4.Display the stock/requirements list for material #### in plant 1000 Tcode (MD04)
Task 3
1. Set the creation indicators and start the MRP run.
Run Single level, single-item planning for pump #### Tcode(MD02). Set the following in the screen
Field | Value |
Processing key | NETCH |
Create Purchase Req. | 2 |
SA Deliv. Sched. Lines | 3 |
Create MRP list | 1 |
Planning mode | 1 |
Scheduling | 1 |
Save the creation indicator setting you have made for the MRP run.
2.Start the MRP run by confirming your entry. Confirm the system warning.
Task 4
Display the planned orders.
1, Display and note the planned orders created for the requirements for material #### Tcode (MD04)
2. Display one of the planned orders for the end product #### in the stock/requirements
Task 5
Convert the planned orders into production orders and release them.
1. Display the current stock/requirements list for material ##### in plant 1000.
2. Convert the first planned order into production order and release the production order. Save the order.
3. Convert the second planned order into production order and release the production order.
4. Refresh the display. Note the production order numbers
Task 6
1. Post the goods movement. Assume that you have produced the product and can post the end product, the pump, to stock
2. Execute the goods movement using transaction MIGO_GO. In this transaction, use Goods Receipt and Order, not Display, to make your selections. Enter the order number, select the Item OK checkbox, and ensure that the movement type 101 has been defined (order to stock). Post the goods movement. Repeat the operation for the second order number.